HOARDINGS
Eagle Rock
Hoardings
Over the past 15 years we have developed many installation processes that provide effective engineerd solutions, ask how we can assist you.
Eagle Rock has installation teams ready to assist with your Hoarding requirements.
Eagle Rock Hoardings | AS 4687 Engineer Certified Public Protection™
A QBCC Licensed Builder, Cm3 Certified, AS 4801 compliant systems, continued innovation and development of AS 4687 Structural Engineer Certified Hoarding Systems.
We provide Capability, Certification and a variety of Hoarding systems to suit your every requirement.
Eagle Rock Hoardings are Structural Engineer Designed and Certified free-standing up to 7.2m high and can be installed up to 10.0m.
Our Systems, Processes and Engineered Solutions provide peace of mind in knowing our clientswill never again need to worry about:
- a hoarding collapse
- repairing another mall ceiling or bulkhead.
Eagle Rock’s accreditation is extensive:
- Cm3 and AS4801 Compliant Processes
- QBCC licensed Open Builder & Site Supervision
- First Aid trained Site personnel
- Rock Solid processes and methodologies
- We provide our clients with regular updates, written and photo reports allowing them to make informed decisions.

Hoardings Services
Eagle Rock has installation teams ready to assist with your Hoarding requirements.
Eagle Rock
Hoardings
Unlike most companies installing Hoardings, Eagle Rock Hoardings does not rely on connections to 10mm plasterboard ceiling as a structural connection point. Why? Because it is a dangerous construction method.
Ask yourself one question: Can a hoarding connected to only 10mm plaster and maybe light tin frame by only a screw BE SAFE? Answer: NO!
It is an outdated and dangerous method of hoarding construction.
Myth:
- A Form 16 cannot be issued by a tradesperson or builder as a Structural Certificate
Truth:
- Structural Engineers will not certify a hoarding connected to plaster ceiling unless:
- The hoarding company has mislead the Engineer or;
- The Engineer does not understand the requirements of the AS 4687 (Australian Standards for Hoardings)
Facts:
- Seek out and review a plan of any Hoarding that claims Structural Engineer’s Certification, now cast your eye over how the hoarding is secured at the top.
- Plans detailing a construction method of plaster connected hoardings most always leave out the ceiling connection detail, why, because the hoarding company is aware it will never pass a competent Structural Engineer’s Certification.
Protect the public, ask the question… Is the hoarding safe?
Get A Quote
Please fill out the form to request a quote and we will be in touch.


